Qlogic QLA 2310F Specifications Page 63

  • Download
  • Add to my manuals
  • Print
  • Page
    / 68
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 62
Chapter C Preparing the Two-Post Telco Rack 55
Installing a Tray in a Telco 2-Post Rack
When installing a tray in a Telco 2-post rack, follow these instructions:
1. Unsnap and remove the left and right end caps on the tray to permit access to
the screw mounting holes (
FIGURE C-5).
FIGURE C-5 Removing the End Caps on the Tray
2. Using two people, one at each side of the tray, carefully lift and rest the tray on
the bottom ledge of the left and right rails (
FIGURE C-6).
Caution Use care to avoid injury. An tray can weigh up to 95 pounds (45 kg).
Page view 62
1 2 ... 58 59 60 61 62 63 64 65 66 67 68

Comments to this Manuals

No comments